NOOR REAL ESTATE · CONSTRUCTION · FINISHING
REAL ESTATE · CONSTRUCTION · FINISHING

From the first brick to the last detail.

Design and delivery under one contract, with a written handover date and a warranty measured in years.
Cairo · Giza · Mansoura.

2026 — CAIRO

NOOR

Since 2006

20 years of continuous engineering practice

200+ projects

Documented in photos

4.9 on Google

From our clients' reviews

Contracted handover

Fixed date, with a late penalty

Services

Four services, one accountable party.

No juggling a contractor, a designer and an engineering office. One contract, one supervising engineer, one party answerable to you.

Modern kitchen in wood finishes with warm concealed lighting

Turnkey finishing

  • Plaster, paint and flooring
  • Gypsum ceilings and concealed lighting
  • Electrics, plumbing and HVAC

TURNKEY · 60–120 DAYS

Entrance hall in vertical timber slats with patterned wall covering

Interior design and 3D

  • 2D drawings and space planning
  • 3D renders before you pay for the build
  • Materials and furniture named by brand

2D · 3D · MATERIAL BOARD

Bare unit before finishing works begin

Contracting and construction

  • Concrete, masonry and structure
  • Extensions and structural alterations
  • Engineering supervision at every stage

STRUCTURE · SUPERVISION

Contemporary villa facade lit at dusk

Property resale

  • Selling finished, move-in-ready units
  • Valuing your unit before it goes to market
  • Finishing before sale to lift the price

RESALE · VALUATION

Packages

Five packages, and the difference is named.

"Lux finishing" is not a specification. Every package carries a material schedule by brand, a duration, and a warranty in years.

Essential

Local porcelain · emulsion paint · local sanitaryware · HPL kitchen

1-year warranty

Plus

Spanish porcelain · Jotun paints · gypsum ceilings with lighting · acrylic kitchen

2-year warranty

Lux

Imported Italian porcelain · natural marble at entrances · German kitchen · linear lighting

3-year warranty

Super Lux

Turkish and Spanish natural marble · solid parquet · smart lighting and audio

4-year warranty

VIP

Carrara marble · rare materials to order · full home automation · fully bespoke design

5-year warranty

Get a quote for your unit

Pick and send. You get a line-item quote with real prices — not a guess from a web calculator.

Send your request on WhatsApp

  • 30% on signing
  • 30% mid-build
  • 30% before handover
  • 10% after final inspection

The last 10% is paid after you inspect and approve. It is not a payment term — it is your leverage.

Before / after

Bare shell to handover. Same room.

Drag the line on any frame. Each pair is one of our own projects — same room, same camera position, before the work and after handover.

A living room on bare shell: concrete walls, exposed first-fix wiring, unscreeded floor The same living room at handover: marble floor, coved gypsum ceiling, crystal chandelier
BeforeAfter
Living room — BARE SHELL → FULL FINISH
A kitchen on bare shell: plumbing and wiring chased into the walls before plaster The same kitchen at handover: timber units, black stone tops, island and under-cabinet light
BeforeAfter
Kitchen — BARE SHELL → FULL FINISH
A bathroom on bare shell: exposed supply pipes and concrete walls The same bathroom at handover: pale marble, freestanding tub, walk-in shower, brass fittings
BeforeAfter
Bathroom — BARE SHELL → FULL FINISH
Complete projects

Handed-over homes, from every angle.

Every project below is shown in full — reception, kitchen, bedrooms and bathrooms from the same unit. So you see all of the work, not its best angle.

Skip to the process

PROJECT 01 — APARTMENT · NEW CAIRO · 210 m² · SUPER LUX

Apartment in warm materials and natural timber

An open reception in natural timber across walls and ceiling, an island kitchen with linear lighting, a master bedroom with an upholstered headboard, and a marble bathroom with a freestanding tub.

Reception in natural timber with concealed lighting
Island kitchen with linear lighting
Master bedroom with a timber wall
Marble bathroom with a freestanding tub
Built-in dressing room with shelving and lighting

PROJECT 02 — APARTMENT · SHEIKH ZAYED · 175 m² · LUX

Family apartment in light materials

A living room with full-height curtains and light materials, a handleless kitchen, two bedrooms, and a bathroom in large-format tile with built-in wardrobes.

Living room with full-height curtains
Handleless kitchen
Bedroom in quiet materials
Bathroom in large-format tile
Built-in wardrobes with interior shelving

PROJECT 03 — APARTMENT · NASR CITY · 140 m² · PLUS

Modern apartment in simple lines

An open plan between living and kitchen, light materials with timber accents, and concealed lighting in every room. A full finish from bare shell in 96 days.

Living room open to the kitchen
Kitchen in timber with under-cabinet lighting
Bedroom with concealed lighting
Bathroom in light materials
Dining corner built into the kitchen

These units are references for the level of execution and the materials we build with. Real NOOR project sets — shown the same complete way — will replace them before launch.

Where we work

Our crews already reach you.

We cover the whole of Cairo and Giza, plus Mansoura. If your area is not listed below, call us — we most likely build there.

Cairo

  • New Cairo and the Fifth Settlement
  • New Administrative Capital
  • Nasr City
  • Heliopolis
  • Maadi and Zahraa El Maadi
  • Zamalek and Downtown
  • Obour and Shorouk
  • Helwan and El Maasara

Giza

  • Sheikh Zayed
  • 6th of October and October Gardens
  • Mohandessin
  • Dokki and Agouza
  • Haram and Faisal
  • Badrashin and Hawamdiya

Mansoura

  • Mansoura
  • Talkha
  • Mit Ghamr
  • Gamasa
Process

Six steps, each with a stated duration.

Not a seventeen-step timeline nobody reads. These are the six steps you will actually go through.

01

Site visit and estimate

2–4 DAYS

02

2D and 3D design

7–14 DAYS

03

Contract and line items

2–3 DAYS

04

Build under supervision

45–200 DAYS

05

Handover and final inspection

3–5 DAYS

06

Warranty and follow-up

1–5 YEARS

Guarantees

A warranty on paper, not in words.

One to five years

Depending on the package, written into the contract with its term and its scope — not a verbal promise.

A fixed handover date

Apartments 60–120 days · villas 120–240 · commercial 30–90, counted from the day we take possession of the unit.

A stated late penalty

If we miss the agreed date, the penalty is written into the contract at a named rate. [PENALTY RATE]

Materials named by brand

The line-item schedule names every material, its brand and its size. Any substitution needs your approval in writing.

Client reviews

People who took the keys and moved in.

What mattered most is that the price never moved. What was written in the schedule is exactly what was built, and handover came four days early.

Eng. Ahmed S. — villa, Sheikh Zayed

I was worried about the materials, but everything arrived in the brand named in the schedule. The engineer sent a photo report every week.

Mona A. — apartment, New Cairo

I have worked with contractors before. The difference is that here one party is accountable. Nobody says "that's not my scope."

Eng. Karim F. — office unit, Nasr City

The 3D renders let me see the apartment before I spent a pound on building it. We changed two things on paper instead of on site.

Dr. Heba M. — apartment, Mansoura

Before you decide

Five questions people ask before signing.

Who are we not right for?

  • Anyone shopping on price alone, with no regard for materials or warranty.
  • Small partial jobs — painting one room, changing a door.
  • Anyone who wants to start building without an agreed, signed-off design.

We say this plainly to save your time and ours.

Does the price go up during the build?

No. The price is tied to a signed line-item schedule. Any increase has to come from a change you request, documented as a written variation order, priced and agreed before the work starts. Nothing "comes up" after signing.

What if I don't like the design?

The design stage includes two free rounds of revisions before sign-off. We do not start building until you have signed the drawings and the final render.

What if you miss the deadline?

The handover date is in the contract, and so is a late penalty at a named rate. [PENALTY RATE] The only exception is delay caused by changes you request or by late payments.

Are the materials really the ones we agreed?

Every material is in the schedule by brand, model and size. You get a weekly photo report, and you inspect before the final payment. If something differs, you do not release the last 10%.

Why pay a firm instead of a contractor?

With a contractor you are the one coordinating the carpenter, the plumber and the electrician, and you carry the cost of every mistake. Here there is one contract, one supervising engineer, and one party answerable to you — and the price difference comes back in waste you never pay for.

FAQ

Questions that keep coming up.

Do you charge for the site visit and estimate?

The first visit and the initial estimate are free within our service areas. The detailed line-item quote follows the visit and reaches you in writing.

Which areas do you work in?

The whole of Cairo and Giza, plus Mansoura and the towns around it. Outside those areas, we assess case by case.

What does turnkey finishing include?

Everything from bare shell to move-in: plaster, flooring, paint, gypsum, electrics, plumbing, doors and windows, kitchen and bathrooms. Loose furniture and appliances are optional and priced separately.

How does the quote builder work?

You pick the unit type, the area and the level, and the button opens WhatsApp with your selections already written in. We come back with a detailed quote — not an estimate generated on a web page.

Can I see your work in person?

Yes. If we have a project under way or recently handed over near you, we arrange a visit once the owner agrees.

Do you only build modern, or neo-classic too?

Both. Modern, minimal and neo-classic — and we help you pick what suits the unit's proportions and natural light.

What if the unit is already finished and needs a partial renovation?

We take on full renovations of finished units. Small partial work is outside our scope.

After you get in touch

What happens next, exactly.

01

A short call

We ask about the unit, the area and the level you have in mind, and we give you an honest price range.

02

A site visit

An engineer visits the unit, measures it and photographs it. You keep the notes even if you go no further with us.

03

A written quote

Line items, prices and a duration. Compare it at your own pace — with no financial commitment.

Get started

Ready to start?

Send us the size of your unit on WhatsApp and we will come back with a quote.

We reply during working hours: Saturday – Thursday, 9:00 – 18:00.

Contact

Come to the office, or call us.

Address

Madinaty — New Cairo, Cairo Governorate

Opening hours

Saturday – Thursday · 9:00 – 18:00

Phone and WhatsApp

010 5587 6111